Acar Yildirim, H., and C. Akcay . “Time-Cost Optimization Model Proposal for Construction Projects With Genetic Algorithm and Fuzzy Logic Approach”. Revista De La Construcción. Journal of Construction, vol. 18, no. 3, Dec. 2019, pp. 554-67, doi:10.7764/RDLC.18.3.554.