[1]
Stumpf González, M., Berghan Finger, F. and Parisi Kern, A. 2015. Control of Finished Work – Final Quality Inspection in a Social Housing Project. Revista Ingeniería de Construcción. 30, 2 (Aug. 2015), 147–153. DOI:https://doi.org/10.4067/S0718-50732015000200006.